Cancel/ Change Order
• Overview of Our Order Adjustment Policy
-
At Beaconring, we understand that customers may sometimes need to change or cancel an order shortly after placing it.
-
Because many of our products involve customization, personalized details, or fast-moving production workflows, we created a balanced system that protects both customer flexibility and production efficiency.
-
The goal is to give you enough time to correct mistakes, while ensuring orders are not delayed or disrupted once production starts.
-
Everything below is designed to be simple, direct, and easy to follow, so you always know what to expect when requesting a change or cancellation.
• Our 4-Hour Flexibility Window (Important)
-
Customers have a strict 4-hour window after placing an order to request any type of modification or cancellation.
-
This is the only timeframe in which changes are possible because orders begin moving through a series of automated and manual production steps immediately after this period.
-
During these first 4 hours, the order is held briefly to allow customers to review and correct information if needed.
-
After 4 hours, the system automatically releases the order into production, where it becomes locked and cannot be altered in any way.
What You Can Change Within 4 Hours:
-
Change of size (e.g., M → L)
-
Change of color or style
-
Correction of custom text or personalization
-
Replacing uploaded images or design files
-
Changing product type or quantity
-
Canceling the entire order
-
Updating the shipping address
Why the 4-Hour Window Is Strict:
-
Production preparation begins right after the holding period. This includes:
-
Reviewing design files for accuracy and compatibility
-
Preparing printing settings or engraving instructions
-
Allocating specific materials, sizes, and inventory
-
Scheduling your order in the production queue
-
-
Once these processes begin, canceling or modifying the order would disrupt the system, cause delays, or waste allocated materials.
-
For this reason, the 4-hour policy is firm and applies to all customers equally.
• Requesting a Change or Cancellation (Within 4 Hours)
-
If you need a modification or cancellation, it is essential to act quickly.
-
The fastest and most reliable communication method is email, as it allows our team to identify and prioritize urgent requests.
How to Request a Change Properly:
-
Send an email to support@beaconring.com immediately.
-
Use this exact subject line format for speed:
-
“URGENT: Order [Your Order Number] Change/Cancellation”
-
-
In your message, include the following:
-
Your full name
-
Email used at checkout
-
Order number
-
Description of the change you need (be as clear and specific as possible)
-
Examples of Clear Requests:
-
“Please change the shirt size from L to XL.”
-
“Please cancel my entire order.”
-
“Please update the shipping address to: [new address].”
-
“I uploaded the wrong image—please replace it with the attached file.”
Alternative Contact Method:
-
You may also use the Contact Us page on our website, but email remains the quickest way for urgent requests.
-
Requests submitted outside of the 4-hour window will be declined because the order will have already entered production.
• No Changes Allowed After 4 Hours
-
Once the flexibility period ends, the order becomes final.
-
At this stage, Beaconring cannot accept requests involving:
-
Size changes
-
Color or design adjustments
-
Custom text corrections
-
Replacement of uploaded files
-
Order cancellation
-
Address changes
-
-
We understand that this can be frustrating if details were overlooked, but this rule allows us to maintain fast processing times and ensure fairness to all customers.
• Customer Responsibility for Address Accuracy
-
The customer is fully responsible for entering complete and correct address details at checkout.
-
This includes verifying the following fields:
-
Street number and street name
-
Apartment, suite, or unit number
-
City, state, and ZIP code
-
Proper spelling of all information
-
Ensure the address is recognized by major carriers such as USPS, UPS, FedEx, or DHL
-
-
Even small errors—missing digits, incorrect ZIP code, or omitted apartment numbers—can cause delivery delays or failures.
• Consequences of Incorrect Address Information
-
If the courier cannot deliver the package due to an incorrect or incomplete address, the customer will be responsible for any re-shipment costs.
-
Examples of issues caused by incorrect addresses include:
-
“Insufficient address”
-
“Address unknown”
-
“Unable to deliver – no unit number provided”
-
“Recipient moved”
-
-
If the order is returned to us, we will contact you to arrange a new shipment. Shipping fees will apply.
If the Package Is Delivered to the Wrong Address Entered by the Customer:
-
If tracking shows that the package was delivered to the address provided at checkout, Beaconring is not responsible for replacement or refund.
-
We cannot retrieve or redirect the package once the courier completes delivery.
-
In these cases, the order is considered fulfilled.
• Customer Support Information
-
Our support team is here to help you navigate order changes, delivery concerns, or inquiries about your purchase.
-
For assistance—especially urgent requests—please reach out using our primary contact method:
-
Email: support@beaconring.com
-
-
Physical business address for reference or documentation:
-
BEACONRING LLC
-
274 Gates St, Palmer, MA 01069, United States
-
• Final Notes
-
This policy is designed to ensure fairness, consistency, and efficiency for all customers.
-
Acting quickly and double-checking details during checkout helps prevent issues later.
-
Thank you for choosing Beaconring—we appreciate your trust and are committed to providing a reliable and smooth shopping experience.